product introduction
The assembled enamel steel water tank produced by our company adopts advanced technology and high-quality materials to ensure clean water quality. Moreover, it is corrosion-resistant, easy to clean, has a longer service life than ordinary water tanks, and is easy to assemble on site. It is flexible, not easy to deform, strong in demand resistance, and high in impact resistance. This product has been used for a long time with good results. Our company has now mass-produced it. Due to the development of the product towards generalization, standardization and serialization, the product quality has a reliable guarantee. project. Moreover, it also provides convenient conditions for the replacement of water tanks in old buildings. The water tanks can store both cold water and hot water.
Selection instructions
1. When ordering, the size of the water tank, the position of the connection pipe and the size of the pipe diameter should be provided.
2. The water tank can be supplied as a complete set.
3. It is advisable to use the storage water temperature at 4-65°C. If the storage water temperature is higher than this value, it can be proposed when ordering, and it will be resolved separately.
4. No other welding parts shall be welded inside and outside the water tank to prevent damage to the porcelain surface.
5. The load of the water tank to the ground should be approved by the structural designer.
6. The water tank should be cleaned regularly to prevent sundries from rushing into the tank when testing the water.
7. When the connection position of the water tank provided by the user is just at the seam of the board, the company needs to adjust it, and the pipe diameter remains unchanged.
Installation and acceptance
1. When installing, leave a maintenance channel not less than 700mm between the box body and the wall, and not less than 500mm on the top and bottom of the box.
2. During the civil construction, the buttresses should be prepared first, and the edge joints around the water tank and between the standard blocks at the bottom of the tank should be located on the supports.
3. After assembly, close the outlet pipe and drain pipe, open the water inlet pipe, and check until it is full of water while draining the water. It is qualified if it does not leak for 24 hours.